Case study

La Parada Emperor's Palace, Johannesburg

Casual dining restaurant, bar and guest area. Johannesburg, South Africa.

40% Energy cost saving for the whole site
Reported
51.7% Less electricity for the walk-in freezer
Measured
62.8% Cool room
Estimated, not measured

Figures from named sites, before solar. Results vary by site.

The operating challenge

Refrigeration never closes

A tapas kitchen, a bar and a guest area trade in bursts, but the cold side of the operation runs every hour of every day. A walk-in freezer and a cool room cycle their compressors against door openings, ambient heat and stock loads, and they carry that load overnight when nothing else in the building is on.

Refrigeration is also the least forgiving system to experiment with: product safety comes first, so any measure had to hold temperature exactly as before while changing when the compressors run.

Baseline

Two baselines, two different kinds of evidence

The whole-site figure comes from the project record, which states the saving as a share of energy cost. No whole-site baseline in kilowatt hours is published for this site, so none is shown here.

For the refrigeration work, the baseline is the daily electricity profile of the walk-in freezer and the cool room before phase-change material was fitted, read from the site's metering dashboard. The freezer circuit produced usable daily totals. The cool-room circuit did not, which is why the two figures below do not carry the same label.

Equipment and controls installed

Thermal storage on the cold side

  • Phase-change material (PCM) thermal storage on the walk-in freezer, fitted without changing how the kitchen works or the temperature it holds.
  • Phase-change material (PCM) thermal storage on the cool room, on the same principle.
  • Multi-channel interval metering across the site, which is what makes a per-circuit result possible at all.

The whole-site saving covers the full scope of works at the site. Only the two refrigeration measures have per-measure figures in the record, so only those are shown.

Results

Before and after, with the proof label for each line

La Parada Emperor's Palace, Johannesburg.
Measure Before After Proof label
Whole-site energy cost Baseline energy cost Reported 40% saving Reported
Walk-in freezer Baseline, before PCM thermal storage 51.7% less electricity Measured
Cool room Baseline, before PCM thermal storage 62.8% less electricity Estimated, from the duty cycle

The freezer figure is measured and the cool-room figure is estimated. They are reported separately and are never added together or averaged into a single refrigeration number. Where the record publishes no before-and-after pair, the before column names the baseline condition rather than a figure.

How the figures were produced

Measurement methodology

The whole-site saving is reported by the project record and has not been independently verified. The walk-in freezer figure is measured: it compares daily totals from the metering dashboard across equal 24-hour windows before and after the thermal storage was fitted. The cool-room figure is an engineering estimate: the dashboard did not return usable consumption for that circuit, so the saving was estimated from the duty cycle rather than metered. That is why it is labelled estimated everywhere it appears.

Funding

How comparable work is funded

This project predates the structure. Comparable work today needs no upfront capital: a Finance Partner funds approved projects and you repay it from the saving. Any finance solution is provided under a separate customer agreement with a Finance Partner and remains subject to credit approval.

How the funding works

Deployment assurance

Your Operation Keeps Running

Installed outside service hours. Local override on every system. No extra work for your staff. The full commitments

Next steps

Prove it at two of your own sites

Send the bills for two sites. We come back with the case.

Evidence note

What sits behind these numbers

Two records sit behind this page: our team's project record for the site and its phase-change material thermal storage record. The whole-site saving is reported by the project record and is not independently verified. The freezer figure comes from dashboard totals. The cool-room figure is an engineering estimate, not a measurement. The two refrigeration figures are never combined. No dollar figure from these records is published, because the records do not state their currency.

Results for another site will differ.

Delivered by the Enspara team, before Enspara was founded in 2026.