No Upfront Capital for Approved Projects
A Finance Partner funds the work. You repay it from the saving, and keep a share from the first month.
Any finance solution is provided under a separate customer agreement with a Finance Partner and remains subject to credit approval.
Who Does What
You
The site, twelve months of bills, and the credit standing behind the finance.
Enspara
Designs, installs and meters the project, and stays accountable for performance for the life of the agreement.
The Finance Partner
Funds the project under a separate agreement with you, and has no say in the measurement result.
Where the Saving Goes
This is not free equipment. It is a performance-based structure.
-
1
Start here
Baseline energy cost
What the site cost to run before the project, from twelve months of bills.
-
2
Measured
Verified saving
What the project took out, metered against that baseline.
-
3
Less
Finance payment
Set per project, over a term agreed for your site.
-
4
Equals
The saving you keep
Cash that stays with the site every month. When the term ends, the payment stops and the whole saving is yours.
Not a quoted offer. Savings, term and payment are set per site after design and credit approval. Carbon reduction is reported alongside, from the verified saving.
The Saving Is the Gap
What the site would have used without the project, less what it actually used, adjusted only for agreed factors like trading hours and weather. Meters on every circuit inside the boundary, a plan you approve before installation, a report every month, reconciled once a year.
Worked example, not a project: baseline 100 MWh, actual use 52 MWh, verified saving 48 MWh. Against a 50 MWh target, that is 96%.
Questions We Are Asked
Is finance guaranteed?
No. It depends on the site, the data and credit approval. Not every site or measure will support it.
Who owns the equipment?
It depends on the finance product used for your project. We put the ownership position in writing before you sign anything.
What if the savings fall short?
Performance is reported against the target every year. Fall short, and Enspara fixes what it controls. Beat it, and the extra is shared on the agreed basis.
What happens when the term ends?
The payment stops. The equipment keeps working and the whole saving stays with the site.
What do I sign?
An NDA before you share bills. Then, if you proceed: a framework agreement with Enspara, an addendum per site, your approval of the M&V plan, and a finance agreement with the Finance Partner.
Is this a free energy audit?
No. It starts with a complimentary review of your bills under NDA, and leads to a site-specific proposal with a contracted target and a funded option.
Your Operation Keeps Running
Installed outside service hours. Local override on every system. No extra work for your staff. The full commitments